Posted by cngcenter on Dec 15, 2020 in CNG station for sale, Large CNG Equipment, Slider, Used CNG Equipment
3-stages Flow rate 250 SCFM 80-115psi to 4,500 psi. Dryer, 3-pack CNG storage, dispenser…You are looking at a complete CNG station equipment package that would connect to a low-pressure line (inlet 6-30psi) and use a 3-stage CNG compressor to produce a flow rate of up to 250 scfm (2 GGE a minute) of up to 4500 psi. The compressor is in good working order with no known issues. It was a part of the small CNG station that has been in service until June 2020. Service...
Read More »
Posted by cngcenter on Dec 15, 2020 in CNG station for sale, Large CNG Equipment, Slider, Used CNG Equipment
5-stages Flow rate 400 SCFM 6-30psi to 4500 psi. Dryer, 3-pack CNG storage, dispenser…You are looking at a complete CNG station equipment package that would connect to a low-pressure line (inlet 6-30psi) and use a 5-stage CNG compressor to produce a flow rate of up to 400scfm (3.4 GGE a minute) of up to 4500 psi. The compressor is in good working order with no known issues. It was a part of the small CNG station that has been in service until June 2020. Service...
Read More »
Posted by cngcenter on Sep 27, 2020 in CNG station for sale, Slider, Used CNG Equipment
If you want to invest in a CNG station for sale, buy your own CNG fueling station, or need a complete set of equipment for your CNG station this option can be good for you. CNG Center is assisting a client with selling a stand-alone unmanned, 1 double-sided dispenser, fast-fill 3600 PSI truck accessible CNG fueling station. PROJECT DESCRIPTION:For sale as a business or equipment only stand-alone, unmanned, 1 double-side dispenser, fast-fill, truck-accessible CNG fueling...
Read More »
Posted by cngcenter on Jun 7, 2013 in CNG Equipment, pictures of cng station
Below are few pictures of CNG filling station utilizing CNG In A Box technology in Marshall Texas operated by: Peake Fuel Solutions 415 Cox Road Marshall, TX The CNG station is fully operational and offers a fast fill option at 7.5 GGE a minute. Visit CNG In A Box page to learn more information about this product
Read More »
Posted by cngcenter on May 16, 2013 in Tips
When our customers ask us about the most important tip to build a solid and reliable CNG station we tell them that it all starts with properly securing your compressor and other equipment to the base. We encourage them to bolt any of the CNG fueling equipment purchased to any substantial, relatively level foundation or base ! The foundation bolts must be of sufficient length to project at least 1/2″ through the nuts to allow for proper leveling. We also suggest that...
Read More »